1. Before You Buy or Rough In the Kitchen
Use this as a pre-installation and post-installation inspection list for a drinking-water, point-of-use reverse osmosis system. For the plumbing sequence, illustrated techniques, startup and troubleshooting, follow the full under-sink RO installation guide linked below and the exact manufacturer's manual.
During a new kitchen build or renovation, document the planned cold feed, shutoff access, approved reject-water connection, faucet opening, cabinet depth and height, service clearance, and an outlet if the selected model requires power. Review the plans before counters, cabinets, and drain assemblies make changes expensive.
- •[ ] Write down the full RO model number, installation manual revision and required clearances
- •[ ] Identify cold-water feed, functional shutoff and acceptable incoming pressure per manual
- •[ ] Reserve cabinet space for unit, tank if included, tubing and future filter changes
- •[ ] Plan approved drain/discharge path, faucet location, and outlet if required
- •[ ] Ask the local building department about permit, drain and backflow rules before rough-in